Project Objectives and Constraints

Procure and Construct ten (10) show and rides at Universal Studios Singapore, Resorts World Sentosa safely within 10 months. Cyclect was to provide project and construction management, mechanical fabrication, electrical, controls and instrumentation and special effects for all rides.

10

show and rides

10months

installation schedule

>1000000

safe hours

Solution Overview

Cyclect full project, safety, construction and logistics management services to install rides at Universal Studios Singapore. There were no companies with experience in building the rides. Cyclect assembled an expert team of mechanical and electrical specialist to build the ten rides in record time.

Key Success Factors

  • Management: detailed and careful planning, coordination and task execution by an organized and experienced project management team to complete the project on time and safely. Regular meetings were conducted to ensure safe and acceptable execution methods, schedules, quality issue. Appropriate response and action were carried out for issues discussed. This ensured the project was always on the right track.
  • Methodology: reviewed all methods for approaching the work for the efficient and cost effective methodology with Universal Studios. Work sequence was planned according to factors in all site constraints to achieve smooth site operation. Specialized machinery and equipment were deployed to help increase productivity of site operation.
  • Manpower: Competent, experienced and skillful manpower were engaged for this project. Each job was assigned to an appropriately skilled personnel, which minimized mistakes and ensured workmanship quality. This project was executed with longer working hours including weekends.

Outcome

The successful implementation of first Singapore’s largest theme park and roller coaster rides.

About USS

Southeast Asia’s first and only Universal Studios theme park, featuring 24 rides, shows and attractions in seven themed zones.