Loading...
0%

Upgrading & Modification Services

Cyclect provides a full spectrum of upgrading and modification services to restore, sustain or increase peak operational efficiency by debottlenecking, optimising, or retrofitting equipment for aging plants and old marine vessels.

Our upgrading and modification teams help owners of industrial process plants or vessels modernise and upgrade to meet changing safety, productivity, and environmental targets.

Based on our decades of experience across industries, we will improve clients’ plants’ or vessels’ operating performance and productivity after commissioning.

Services

  • Project planning, management & scheduling
  • Field execution, coordination & oversight
  • Risk Analysis
  • Resource planning
  • Safety management
  • Documentation
  • Contract management
  • Contingency planning
  • Feasibility studies 
  • Front-end engineering design
  • Detailed engineering and design
  • Procurement

  • Removal, Demolition, or upgrading of plant equipment
  • Preservation of equipment
  • Optimization & debottlenecking engineering
  • Retrofit, upgrading, modernization and/or replacement of machinery, equipment and systems
  • Equipment Hook-up 
  • Support in equipment shut-down and start-up procedures
  • Inspection, cleaning, testing, commissioning
  • Hydro / pneumatic pressure test
  • Non-destructive testing (NDT)

  • Electrical and control panels
  • Electrical power distribution system
  • Gensets
  • Motors
  • Generators, Alternators
  • Transformers
  • Uninterruptible Power Supply (UPS) system
  • Pipe and valve work including removal, fabrication, and installation.
  • Coating & Painting works
  • Heat tracing
  • Customized lifting solutions
  • Installation and alignment

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Previous
Next

Our Testimonials

The Cyclect team has maintained the required professionalism by delivering good quality within the agreed time frame. The members worked long and hard, even at night to bring the shutdown works safely and following safe management measures during the COVID-19 situation. In addition, the team’s response to sudden requests for change was fast and accurate.
We were very happy with the professionalism that Cyclect has demonstrated during the project. The installation of the hoarding as well as the actual removal activities were executed with minimal disruption to production and without compromising quality or safety. Very good time management has ensured that the project was completed on time.
Completion of removal of the old chiller to completion of commissioning of a chiller within 7 days is indeed an industry record for many to admire. I would not hesitate to recommend you and your team of dedicated and committed engineers and team to perform future works within our operations plant and other customers in the industry who require your professional services.
CSL_logo-removebg
West_Blue
abbvie-logo